ADVERTISEMENT FOR BIDS
CITY OF OREM
56 North State Street
Orem, UT 84057
RECEIPT OF BIDS: Separate sealed BIDS or Electronic Submittal using Bonfire for the construction of the 2026 Sewer Pipe Lining Project will be received by Taggart Bowen, City Engineer at the City of Orem, Engineering Division, 56 North State, Orem, UT 84057, or opened electronically on Bonfire until April 21, 2026 at 3:00 PM. and then at said office publicly opened and read aloud. The preferred method for submitting a bid is by using Bonfire at utah.bonfirehub.com (Select the search bar > > enter “City of Orem” > Enter).
BIDDING QUESTIONS – Use Bonfire to submit questions and download documents relating to bid items, specifications, and other technical questions. The project engineer is Erica Zaugg, 801-229-7549. A mandatory pre-bid meeting will be held on April 8, 2026at 3:30 PM at the City Center, 56 North State Street, Orem, UT 84057 in the Ponderosa Community Development Conference Room.
OBTAINING CONTRACT DOCUMENTS: The CONTRACT DOCUMENTS may be obtained March
31, 2026 on Bonfire or at the City of Orem, Engineering Division, Community Development Offices, 56
North State Street, Orem, UT 84057. There is no fee from the City to obtain the documents on Bonfire.
There will be a $20.00 non-refundable fee for a copy of the plans and specification. (An additional $5.00
service charge will be assessed if the plans and specifications are to be mailed).
DESCRIPTION OF WORK: The WORK includes but is not limited to the following: Rehabilitation of sewer line by CIPP lining (254 LF 6-inch; 14,313 LF 8-inch; 1,019 LF 10”; 2,514 LF 12”; 2,047 LF 21”; 693 LF 24”; 4,581 LF 30”; 565 LF 36”; 1,522 LF 42”), installation of 1180 SF of protective lining in 5 sanitary sewer vaults and 5 sanitary sewer manholes, and all associated dewatering, bypass pumping, and lateral connections required to complete the work. The engineer’s estimate for the work is $3,500,000 to $4,000,000.
SITE OF WORK: The site of the WORK is located at State Street (1200 N to 1300 N), 1060 W (500 N to 570 N), 370 N (930 W to 985 W), 550 N (500 W to 600 W), 300 E (600 N to 700 N), 340 E (600 N to 650 N), 600 N (250 E to 300 E), Atlantis Drive (700 N to 750 N), 400 N (375 W to 400 W), 1000 E (560 N to 600 N), 300 E & 300N, 250 E (Ninetta Circle to 400 N), 450 E (600 N to 650 N), 500 E (600 N to 650 N), Center Street & State Street, 100 S (430 E to 470 E), 360 S (700 E to 750 E), 700 E (400 S to 325 S), 600 E (400 N to 600 N), 400 N (600 E to 650 E), 700 E (200 N to 370 N), Center Street (450 E to Paradise Drive), Paradise Drive (Center Street to 60 N), Eastwood Drive (Westwood Drive to Center Street), Westwood Drive (Campus Drive to Center Street), 600 S & State Street, 1700 S (650 E to 700 E), 50 E (1200 S to 1150 S), 400 W (900 S to 850 S), 900 S (100 W to 400 W), 2000 S (140 E to 250 E), 250 E (2000 S to 1864 S), 1864 S (250 E to 543 E), 1200 W (320 S to 500 N), 1000 S (Geneva Rd to Water Reclamation Blvd).