RECEIPT OF BIDS: Separate sealed BIDS or Electronic Submittal using Bonfire for the construction of
2026 Roadway Project will be received by Taggart Bowen, City Engineer at the City of Orem,
Engineering Division, 56 North State, Orem, UT 84057, or opened electronically on Bonfire until January
28th, 2026 at 3:00 pm and then at said office publicly opened and read aloud. The preferred method for
submitting a bid is by using Bonfire at utah.bonfirehub.com (Select the search bar > > enter “City
of Orem” > Enter).
BIDDING QUESTIONS – Use Bonfire to submit questions and download documents relating to bid
items, specifications, and other technical questions. The project manager is Samuel Cuessy, 801-229-7542. A mandatory pre-bid meeting will be held on January 14th, 2026 at 2:00 pm at the City Center, 56 North State Street, Orem, UT 84057 in the Community Development Ponderosa Conference Room.
OBTAINING CONTRACT DOCUMENTS: The CONTRACT DOCUMENTS may be obtained
January 7th on Bonfire or at the City of Orem, Engineering Division, Community Development
Offices, 56 North State Street, Orem, UT 84057. There is no fee from the City to obtain the documents on
Bonfire. There will be a $20.00 non-refundable fee for a copy of the plans and specification. (An
additional $5.00 service charge will be assessed if the plans and specifications are to be mailed).
DESCRIPTION OF WORK: The WORK includes 44,985 square yards asphalt section 1½” edge mill and 2” overlay (1/2” PG 64-34), 8,670 square yards asphalt section 2” profile mill and 2” overlay (1/2” PG 64-34), 11,100 square yards roadway excavation and reconstruction 5” asphalt (1/2” PG 64-34) and other roadway improvements.
SITE OF WORK: The site of the WORK is located at 950 North (from 400 East to 800 East), 400 West
(from 400 North to Center Street), 800 South (From 1200 West to 400 West), and Center Street (see extents on construction plans).